When operating the BGA rework station, the following common safety precautions need to be followed to ensure personal safety and equipment safety.
1. Pre-operation Preparation
Before operating the SMD&BGA Rework Station, please read the user manual of the equipment carefully to understand the functions, operation methods and safety precautions of the equipment. If in doubt, consult the equipment manufacturer or a professional.
2. Working environment
Ensure that the working environment is clean, tidy, well-ventilated and maintains proper temperature and humidity. Avoid using the BGA Rework Station in a humid, overheated or flammable environment.
3. Wear protective equipment
Operators should wear appropriate protective equipment, such as protective glasses, gloves and masks. This protects the operator from hazards such as high temperatures, toxic gases and dust.
4. Follow steps
Follow the BGA rework process step-by-step as outlined in the equipment owner’s manual or operator’s guide. Avoid skipping steps or using improper methods that could result in personal injury or equipment damage.
5. Avoid touching hot parts
During the operation of the equipment, parts such as the preheating platform, heater head and circuit board may become very hot. Avoid touching these hot parts directly to avoid burns.
6. Make sure the equipment is grounded
Make sure the power supply of the BGA Rework Station is well grounded to prevent safety accidents such as electric shock and electrostatic discharge.
7. Power Socket and Cable
Ensure that the power socket and cable are in good condition and avoid using damaged or overloaded power sockets. During operation, pay attention to the placement of cables and avoid placing them near high temperature parts or stepping on them.
8. Equipment Maintenance and Inspection
Maintain and inspect the BGA Rework Station on a regular basis to ensure that the equipment is operating properly. If equipment failure or abnormality is found, please turn off the power immediately and contact professionals for repair.
9. Handling after operation
After operation, please turn off the power of the equipment and wait for the equipment to cool down before cleaning and maintenance. Avoid cleaning the equipment while it is still hot to avoid burns.
By following the above safety precautions, you can reduce the risk of accidents during operation of the BGA Rework Station. At the same time, ensure that you consult a professional in a timely manner when you encounter problems to ensure safe and correct operation.
Features of NeoDen ND772R BGA rework station
1. The linear slide base allows the X, Y and Z axes for precise fine-tuning or quick positioning action.
2. Touch screen controls the heating system and optical alignment device for convenient and flexible operation to ensure alignment control accuracy.
3. The PCB board positioning uses the V-shaped card slot, flexible and convenient mobile universal fixture, to protect the PCB board.
4. The high power cross-flow fan is used to quickly cool the PCB, and to improve the working efficiency.
5. In the case of temperature runaway, the circuit can automatically power off, has a double over-temperature protection function.
Post time: Oct-31-2024